Revision by System
July 30, 2026 — 6:40 PM — compared to revision from Nov. 23, 2025
Content Diff
Added
Removed
---
+++
{
"pk": 263,
- "body": "[{\"type\": \"paragraph\", \"value\": \"<p>The Macdonald Engineering Building is one of the six engineering\\r\\nbuildings at McGill. It was built in 1908 to create space for McGill's\\r\\nquickly increasing enrollment at the time. The building houses both the\\r\\ndepartments of civil and mechanical engineering, the Office of the Dean\\r\\nof Engineering as well as a series of engineering labs and\\r\\nclassrooms.</p>\\r\\n<h1 id=\\\"history\\\">History</h1>\\r\\n<p><img src=\\\"MacdonaldBuilding1934.gif\\\"\\r\\ntitle=\\\"The Macdonald Engineering Building in 1934\\\"\\r\\nalt=\\\"The Macdonald Engineering Building in 1934\\\" /> In the 1890's, the\\r\\nArts Building was becoming more and more crowded as enrollment climbed\\r\\nand new faculties were added to the University. Thus, in 1893, the\\r\\nApplied Science Faculty, as Engineering was then called, was relocated\\r\\nto a new home consisting of two structures, one donated by Thomas\\r\\nWorkman and one by Sir William Macdonald, one of McGill's most generous\\r\\nbenefactors.</p>\\r\\n<p>The site chosen for the new additions to the campus was just\\r\\nsoutheast of the Arts Building, near University Street. The architect\\r\\ncommissioned for both was Sir Andrew Taylor and his partner at that\\r\\ntime, William Gordon. In designing the Workman Workshops, Taylor kept in\\r\\nmind that it was to be used as the machine and technical shops and as\\r\\nsuch needed to be sturdy, functional, and not overly ornamented. In\\r\\nkeeping with these ideas, the lower three storeys were constructed of\\r\\nrough hewn Montreal limestone. After the Old Medical Building burned\\r\\ndown on April 16, 1907, some of its stone was used to add a fourth\\r\\nstorey with rounded arched windows to the Workman Workshops. The\\r\\nproportions of the structure are well suited to laboratories housing\\r\\nlarge machines. In 1947, this building was changed considerably. A fifth\\r\\nfloor was added in finished stone by McDougall, Fleming, and Smith, and\\r\\nthe labs were transformed into office and classroom spaces.</p>\\r\\n<h1 id=\\\"architecture\\\">Architecture</h1>\\r\\n<p>Taylor's imposing, five-storey Macdonald Engineering Building\\r\\nfeatured a symmetrical, Italian Renaissance facade and was, like most of\\r\\nthe campus, constructed of Montreal limestone on the exterior. The\\r\\ninterior was lined with brick and was purely functional, containing on\\r\\nthe ground floor a foundry, a forge, a steam and thermodynamics lab, a\\r\\ndynamo and engine room, and a hydraulics lab. The first floor housed a\\r\\npattern shop, a wood shop, electrical equipment, and some offices. Most\\r\\nof the offices and classrooms were located on the second floor. The\\r\\nthird floor included a library and an architecture and apparatus museum\\r\\nand the fourth was a studio and drafting room.</p>\\r\\n<h1 id=\\\"tenants\\\">Tenants</h1>\\r\\n<p>The Macdonald Engineering Building houses the following offices:</p>\\r\\n<ul>\\r\\n<li><a href=\\\"Civil_Engineering_Undergraduate_Society\\\" class=\\\"wikilink\\\"\\r\\ntitle=\\\"Civil Engineering Undergraduate Society\\\">Civil Engineering\\r\\nUndergraduate Society</a></li>\\r\\n<li><a href=\\\"https://www.mcgill.ca/civil/\\\">Department of Civil\\r\\nEngineering</a></li>\\r\\n<li><a href=\\\"https://www.mcgill.ca/mecheng/\\\">Department of Mechanical\\r\\nEngineering</a></li>\\r\\n<li><a href=\\\"https://www.mcgill.ca/engineering/about-us\\\">Faculty of\\r\\nEngineering</a></li>\\r\\n</ul>\\r\\n<p><a href=\\\"Category:Buildings\\\" class=\\\"wikilink\\\"\\r\\ntitle=\\\"Category:Buildings\\\">Category:Buildings</a></p>\\r\\n\", \"id\": \"925ebe19-9c90-424a-91bc-602b65ba3b87\"}]",
+ "body": "[{\"id\": \"925ebe19-9c90-424a-91bc-602b65ba3b87\", \"type\": \"paragraph\", \"value\": \"<p><p>The Macdonald Engineering Building is one of the six engineering\\r buildings at McGill. It was built in 1908 to create space for McGill's\\r quickly increasing enrollment at the time. The building houses both the\\r departments of civil and mechanical engineering, the Office of the Dean\\r of Engineering as well as a series of engineering labs and\\r classrooms.</p>\\r <h1 id=\\\"history\\\">History</h1>\\r <p><img src=\\\"MacdonaldBuilding1934.gif\\\"\\r title=\\\"The Macdonald Engineering Building in 1934\\\"\\r alt=\\\"The Macdonald Engineering Building in 1934\\\" /> In the 1890's, the\\r Arts Building was becoming more and more crowded as enrollment climbed\\r and new faculties were added to the University. Thus, in 1893, the\\r Applied Science Faculty, as Engineering was then called, was relocated\\r to a new home consisting of two structures, one donated by Thomas\\r Workman and one by Sir William Macdonald, one of McGill's most generous\\r benefactors.</p>\\r <p>The site chosen for the new additions to the campus was just\\r southeast of the Arts Building, near University Street. The architect\\r commissioned for both was Sir Andrew Taylor and his partner at that\\r time, William Gordon. In designing the Workman Workshops, Taylor kept in\\r mind that it was to be used as the machine and technical shops and as\\r such needed to be sturdy, functional, and not overly ornamented. In\\r keeping with these ideas, the lower three storeys were constructed of\\r rough hewn Montreal limestone. After the Old Medical Building burned\\r down on April 16, 1907, some of its stone was used to add a fourth\\r storey with rounded arched windows to the Workman Workshops. The\\r proportions of the structure are well suited to laboratories housing\\r large machines. In 1947, this building was changed considerably. A fifth\\r floor was added in finished stone by McDougall, Fleming, and Smith, and\\r the labs were transformed into office and classroom spaces.</p>\\r <h1 id=\\\"architecture\\\">Architecture</h1>\\r <p>Taylor's imposing, five-storey Macdonald Engineering Building\\r featured a symmetrical, Italian Renaissance facade and was, like most of\\r the campus, constructed of Montreal limestone on the exterior. The\\r interior was lined with brick and was purely functional, containing on\\r the ground floor a foundry, a forge, a steam and thermodynamics lab, a\\r dynamo and engine room, and a hydraulics lab. The first floor housed a\\r pattern shop, a wood shop, electrical equipment, and some offices. Most\\r of the offices and classrooms were located on the second floor. The\\r third floor included a library and an architecture and apparatus museum\\r and the fourth was a studio and drafting room.</p>\\r <h1 id=\\\"tenants\\\">Tenants</h1>\\r <p>The Macdonald Engineering Building houses the following offices:</p>\\r <ul>\\r <li><a href=\\\"Civil_Engineering_Undergraduate_Society\\\" class=\\\"wikilink\\\"\\r title=\\\"Civil Engineering Undergraduate Society\\\">Civil Engineering\\r Undergraduate Society</a></li>\\r <li><a href=\\\"https://www.mcgill.ca/civil/\\\">Department of Civil\\r Engineering</a></li>\\r <li><a href=\\\"https://www.mcgill.ca/mecheng/\\\">Department of Mechanical\\r Engineering</a></li>\\r <li><a href=\\\"https://www.mcgill.ca/engineering/about-us\\\">Faculty of\\r Engineering</a></li>\\r </ul>\\r <p><a href=\\\" title=\\\"</a></p></p>\"}]",
"live": true,
- "path": "000100010078",
+ "path": "0001000100BM0004",
"slug": "macdonald-engineering-building",
- "depth": 3,
+ "depth": 4,
"owner": null,
"title": "Macdonald Engineering Building",
"locale": 1,
"expired": false,
"alias_of": null,
"numchild": 0,
- "url_path": "/home/macdonald-engineering-building/",
+ "url_path": "/home/buildings/macdonald-engineering-building/",
"expire_at": null,
"locked_at": null,
"locked_by": null,
"seo_title": "",
+ "side_info": "",
"go_live_at": null,
+ "side_image": null,
"draft_title": "Macdonald Engineering Building",
- "content_type": 30,
+ "page_status": "up_to_date",
+ "website_url": "",
+ "content_type": 21,
+ "edit_summary": "Auto-fix: convert leftover MediaWiki markup to HTML",
+ "facebook_url": "",
"phone_number": "815 Sherbrooke St W Montreal, Quebec H3A 0C3",
- "live_revision": 261,
+ "tagged_items": [],
+ "contact_email": "",
+ "instagram_url": "",
+ "live_revision": 495,
+ "related_links": [],
"show_in_menus": false,
- "latest_revision": 261,
- "search_keywords": " Macdonald Engineering",
+ "latest_revision": 495,
"translation_key": "96c20301-4644-4e60-9c25-14106ccb0de7",
- "last_published_at": "2025-11-23T07:11:03.138Z",
+ "last_published_at": "2025-11-23T07:24:05.754Z",
"first_published_at": "2025-11-23T07:11:03.138Z",
"search_description": "",
+ "side_image_caption": "",
"address_head_office": "The West Facade of the Macdonald Engineering Building",
"wagtail_admin_comments": [],
"has_unpublished_changes": false,
- "latest_revision_created_at": "2025-11-23T07:11:03.134Z"
+ "latest_revision_created_at": "2025-11-23T07:24:05.622Z"
}