McGill Engineers in Action: Difference between revisions

Created the page
 
No edit summary
Line 38: Line 38:
'''''Design Team'''''<br>
'''''Design Team'''''<br>
Design, in collaboration with another university and professionals, pedestrian footbridges on a site identified and assigned by EIA staff. The geometrical design as well as all the calculations have to be drawn, computed and verified during the year in order to ensure the efficacy and the safety of the footbridge.
Design, in collaboration with another university and professionals, pedestrian footbridges on a site identified and assigned by EIA staff. The geometrical design as well as all the calculations have to be drawn, computed and verified during the year in order to ensure the efficacy and the safety of the footbridge.


===Get Involved===
===Get Involved===